Arthur Palmer is a qualified professional, that works in Parsons Brinckerhoff as a Casting Yard Engineer and Technical Principal since 2019. Arthur has earned professional experience in more than 24 positions at different companies. Arthur Palmer went to the California Polytechnic State University-San Luis Obispo and was studying from 1983 to 1984. This person has such professional qualifications as Certified Grouting Technician, Pci Quality Control Personnel Certification Level 1, and Pci Quality Control Personnel Certification Level 2. Albany, New York is the city, where this person was lastly known to settle. The professional's phone and email are accessed through this website on demand.
Name variants:
Art Palmer, Artie Palmer, Arty Palmer
Last updated Jul 03, 2024

Contact Information

Last Update
Jan 29, 2016
Email
ar**@mwgroup.net
Location
Albany, NY
Company
Parsons Brinckerhoff

Workplace

Casting Yard Engineer and Technical Principal

Work History

Casting Yard Engineer and Technical Principal

I-395/SR 836/I-95 DESIGN-BUILD PROJECT
from Jul 2019

Precast Specialist

1 Penn Plz, New York, NY 10119
2) six-story parking garages for Loudoun County, part of the Metrorail Silver Line, Phase 2.
Jun 2018 — Jul 2019

Casting Yard Engineer

1 Penn Plz, New York, NY 10119
Reviewing precast segmental casting yard operations for NCDOT's Bonner Bridge and monitoring daily geometry control procedures and software data analysis.
Feb 2018 — Jun 2018

Quality Control and Quality Assurance Director

172 Prospect Hill Rd, Brewster, NY 10509
Managing quality control lab and inspection operations for a PCI Certified precast concrete manufacturing plant. Established architectural finish and structural product standards for plant...
Mar 2015 — Jun 2016

Senior Construction Manager

1/13 to Present CSA Structures PreCon Manager for $1Bil Research Facility, Malta, NY. Responsible for building shell components, design constructability, and schedule input. Also, working ...
Feb 1, 2008 — Mar 1, 2015

Sr. Construction Manager

Malta, NY
1/13 to Present - CSA Structures PreCon Manager for $1Bil Research Facility, Malta, NY. Responsible for building shell components, design constructability, and schedule input. Also, working...
from Feb 2008

Senior Construction Inspector

Ft. Edward, NY
CM Team on Hudson River Dredging Project building the largest sediment processing facility in the world. Client representative for sitework, storm water drainage system, road construction, ...
Mar 2007 — Nov 2008

Senior Construction Inspector

5875 Trinity Pkwy #300, Centreville, VA 20120
CM Team on Hudson River Dredging Project building the largest sediment processing facility in the world. Client representative for sitework, storm water drainage system, road construction, r...
Mar 2007 — Nov 2008

Const. Practices Committeee

2005 — 2010

Const Practices Committeee

Precast concrete casting yard expert
2005 — 2010

Lead Construction Engineer

Casting yard manager for precast segmental bridges on Seattle Light Rail, Seattle, WA and Central Artery Project, Boston, MA Managed precast segmental construction at the casting yard and pr...
Jul 2000 — Dec 2006

Owner

P/O Box 248, Waterford, NY
2017 LHV Precast, Kingston, NY Assisting owners with business development/expansion efforts 2016 2017 Marcy Nanocenter Project, Utica, NY M+W Consultant to manage Site Logistics Plan,...
Jan 2000 — Feb 2018

Self-Employed

Waterford, NY
•2000 BQE Ramp to Williamsburg Bridge, Brooklyn, NY - Worked with Fort Miller, Schuylerville, NY; to set-up precast segmental casting operations. Reviewed all aspects of plant setup and ad...
from 2000

Project Manager

Milford, MA
• Project Manager of precast and cast-in-place bridge projects to insure ease of fabrication & assembly, proper quality control techniques and adherence to project specifications. • Dire...
1999 — 2001

Plant Manager

Boston, MA
• Central Artery Project C19B1, Boston, MA. (precast). • Designed and set-up new facility to precast segmental bridge products for 1742 segments (100 employees). Total length of 16,700’, wit...
1998 — 1999

Project Manager

550 Cheshire Rd, Pittsfield, MA 01201
20 million (precast) - managed precast segmental bridge casting yard start-up for Central Artery Projects, C09C1 (431 segments / 4,200 length) and C09A4 (1032 segments / 10,800 length), B...
1997 — 1998

Project Manager

Pittsfield, MA
• $20 million (precast) - managed precast segmental bridge casting yard start-up for Central Artery Projects, C09C1 (431 segments / 4,200’ length) and C09A4 (1032 segments / 10,800’ length),...
1997 — 1998

VP & General Manager

Framingham, MA
Increased corporate sales in 1992 by 30%, in 1993 by 25%, and established the prestress division in 1994 increasing sales by 50%. Reduced overhead 28% by relocating the company and restruct...
1992 — 1997

Project Manager

Pittsfield, MA
Reported to the Chief Structural Engineer. Responsible for efficient management of multiple projects from contract through punchlist completion. Led design and site meetings on design/build ...
1989 — 1991

Project Manager

Rochester, VT
• Complete responsibility for multiple projects including: budgeting, CPM scheduling, subcontractor negotiations, client interface, and assembling design teams for Design/Build projects. Par...
1988 — 1989

Project Manager

567 west Douglas Ave, Wichita, KS 67202
Complete responsibility for multiple projects including: budgeting, CPM scheduling, subcontractor negotiations, client interface, and assembling design teams for Design/Build projects. Partn...
1988 — 1989

Quality Control Manager

PIttsfield, MA
• Managed QC Department for prestress concrete plant supplying product throughout the Northeast and bridge components to MA Highway Department, ConnDOT, and NYDOT. Responsible for testing ce...
1984 — 1988

Quality Control Manager

550 Cheshire Rd, Pittsfield, MA 01201
Managed QC Department for prestress concrete plant supplying product throughout the Northeast and bridge components to MA Highway Department, ConnDOT, and NYDOT. Responsible for testing ceme...
1984 — 1988

Concrete Foreman

Indian Wells, CA
• Responsible for the concrete placement, casting and custom finishing of a concrete-framed architectural building, including all interior pools and waterfalls at the Vintage Country Club.
1980 — 1983

Occupations

Home Contractor
Construction Manager
Foreman
Independent Contractor
Counselor
Executive
Manager
Construction
Construction Administrator
Contractor
Independent Business Owners
Advisor
Operations Manager

Skills

Estimates
Value Engineering
Construction Management
Construction
Cost Control
CPM Scheduling
Concrete
Design-Build
Feasibility Studies
Project Coordination
Contract Negotiation
Concept Development
Labor Relations
Quality Assurance
Schedule
Constructability
Rail
Structural Engineering
MS Project
Inspection
Project Planning
P3
High Rise
Design Management
Earthworks
Earned Value Management
Quality Control
Construction Drawings
Proposal Writing
Quantity Surveying
Facilities Management
AutoCAD
EPC
Steel
Cost Engineering
Commercial Management
Suretrack
Steel Structures
Project Control
Project Engineering
Procurement
Green Building
Construction Safety
Cost Planning
Materials
Renovation
Construction Engineering
Cost Management
BIM
Project Bidding
Cpm Scheduling
Design Build
Autocad
Ms Project
Epc
Bim
Login